Drywall finish levels 0-5: what each level means for your estimate

Finish level is one of the biggest swing factors in a drywall bid. The industry definitions come from Gypsum Association GA-214, Recommended Levels of Gypsum Board Finish, which is also referenced in ASTM C840. Always bid the level in the specs, and if the specs don't say, ask in an RFI.

The levels

How it changes the estimate

Write it into your proposal

State the finish level by area in your inclusions, for example "Level 4 finish at all painted walls; Level 1 above ACT ceilings." That heads off disputes at punch list.