šŸ“ QuickBidSetup.com

Comparing Travel Cost Rules Under FAR 31.205-46 for Federal Bids

By QuickBidSetup Editorial Team · Published October 31, 2026 · Sources linked below

FAR 31.205-46 Travel Costs: Per Diem vs Actual Guide

When sending specialty trade crews, project superintendents, or estimators out of town for federal projects, travel expenses can quickly create contract disputes if calculated incorrectly. Under FAR 31.205-46, travel expenses incurred on official company business are allowable only within specific regulatory ceilings and criteria. Understanding how the Federal Acquisition Regulation compares per diem methods against actual expense allowances, vehicle reimbursements, and documentation mandates is essential when building your estimate for general conditions job costs.

Standard Per Diem Limits vs. Actual Expense Method

Under FAR 31.205-46, costs for lodging, meals, and incidental expenses can be based on per diem, actual expenses, or a combination of both, provided the method results in a reasonable charge. However, these costs are generally allowable only to the extent that they do not exceed on a daily basis the maximum per diem rates in effect at the time of travel as established by three distinct federal authorities:

In contrast, contractors facing special or unusual situations may bill actual expenses exceeding standard per diem ceilings. To make higher amounts allowable, the situation must meet the conditions warranting actual expense treatment under the applicable travel regulations, must not exceed the higher amounts authorized for federal civilian employees, and requires a written justification approved by an officer of the contractor's organization or designee. When actual costs are used, a receipt is required for each expenditure of $75.00 or more. Furthermore, if higher actual expenses become necessary repetitively or on a continuing basis in a given area, the contractor must obtain advance approval from the contracting officer.

Full Travel Days vs. Partial Days and Lodging-Free Trips

Estimators cannot simply carry the maximum daily per diem rate across every travel day on a job schedule. Maximum per diem rates generally do not represent a reasonable daily charge when no lodging costs are incurred, or on partial travel days such as the day of departure and return.

Under these conditions, downward adjustments from maximum per diem allowances are normally required. While contractors are not required to calculate these downward adjustments strictly in accordance with the Federal Travel Regulations or Joint Travel Regulations, the adjusted figures must ultimately result in a reasonable charge to the federal contract.

Commercial Airfare vs. Contractor-Owned Aircraft

When crew or management transport involves air travel, the regulations set strict limits based on the travel method selected:

Business Travel vs. Commuting in Company Vehicles

For ground transportation, contractors may base charges on mileage rates, actual costs, or a combination of both. Costs for contractor-owned or leased automobiles—including lease, operation, personnel, maintenance, depreciation, and insurance—are allowable to the extent the vehicles are used for official company business. To avoid unallowable charges, estimators should review common mistakes when pricing mileage and truck costs into bids.

A critical distinction exists between jobsite transport and personal commuting. The portion of company-furnished automobile costs related to personal use by employees, including driving to and from work, represents compensation for personal services and is unallowable under FAR 31.205-6(m)(2).

Mandatory Travel Documentation Rules

Regardless of whether travel is charged through mileage, per diem, or actual receipts, expenses are allowable only if specific details are documented. Contractors must record:

  1. The date and place (city, town, or similar designation) of the expenses.
  2. The purpose of the trip.
  3. The name of the individual on the trip, including their title or relationship to the contractor.

To reduce disputes over cost allowability, contractors and contracting officers may also utilize an advance agreement under FAR 31.109 to establish agreed-upon travel procedures before performance begins.

Sources

Acquisition.GOV: FAR 31.205-46 Travel costs

Published October 31, 2026. No affiliate links on this page. Facts come from the sources linked above; check them for updates.