Bid day checklist for drywall and ceiling subcontractors
Most bid-day mistakes aren't math errors. They're missed addenda, unclear scope, and things everyone assumed somebody else had. Run this list before every submission.
Documents
- ☐ Every addendum acknowledged and priced (check the plan room one last time on bid day).
- ☐ Spec sections for your trade read in full, including Division 01 general requirements (temporary protection, cleanup, closeout, attic stock).
- ☐ Finish levels by area confirmed (see drywall finish levels).
- ☐ Rated assemblies matched to their design listings (see fire-rated assemblies).
Scope
- ☐ Inclusions written by area and system.
- ☐ Exclusions stated clearly: firestopping, painting, insulation, blocking for other trades, access doors, permits, bonds.
- ☐ Alternates and unit prices filled out exactly as the bid form asks.
- ☐ Items commonly split between trades assigned clearly: backing, deflection track, access panels, ceiling fixture supports.
Numbers
- ☐ Quantities double-checked against a second method (for example, wall LF × height vs. board count).
- ☐ Labor productivity matches the conditions: heights, lifts, phasing, night work.
- ☐ Material quotes current and valid through the expected buyout date. Note any escalation exposure.
- ☐ Markup applied correctly. Know your margin (see markup vs. margin).
Bonds, insurance and schedule
- ☐ Bid bond or other security, if the documents require it. Smaller contractors who struggle to get bonded can look at the SBA Surety Bond Guarantee Program.
- ☐ Insurance requirements reviewed for any unusual limits.
- ☐ Schedule and manpower assumptions stated.
Submission
- ☐ Proposal on the required form, signed, with the correct project name and bid date.
- ☐ Sent to the right contact, before the deadline, with read receipt or upload confirmation saved.
Speed up takeoff and pricing so you have time for this list: see On-Screen Takeoff vs. Quick Bid.