📐 QuickBidSetup.com

Estimating fire-rated wall and ceiling assemblies: what to check

Fire-rated assemblies are where "close enough" estimating gets expensive. A rated wall has to be built exactly like the tested design, so the design listing, not a rule of thumb, drives your quantities.

Start with the design number

Drawings usually reference a tested design, such as a UL design number or a design from the Gypsum Association's Fire Resistance Design Manual (GA-600). These assemblies are tested to ASTM E119. Pull the actual listing for every rated wall type on the job and read it before you price.

What the listing controls

The hidden scope

Proposal language

List each rated wall type with its design number and rating. State what's excluded (for example, "firestopping of penetrations by others"). That protects you if the drawings and the listings disagree.

Related: metal stud framing takeoff · bid day checklist

Published October 25, 2026. Some links may be affiliate links; see our Affiliate Disclosure.